London bridge is closing down
|
LondonTopic.ca |
|
|
09/17/2009 |
One of London's busier bridges will be closing down for construction for at least a two-day period starting Saturday (Sept. 19).
The Norman A. Bradford Bridge on Oxford Street between Wharncliffe Road
and Talbot Street is set to go under construction starting Saturday at 6 a.m., until Monday (Sept.21) at 6 a.m. The actual construction period is weather dependent.
City officials are advising the public that traffic flow over the well-used bridge will be rerouted:
* Eastbound traffic will be directed south on Wharncliffe Road,
east on Riverside Drive and King Street, North on Richmond Street to
Oxford Street.
* Westbound traffic will be detoured south on Richmond Street,
west on Queens Avenue and Riverside Drive, North on Wharncliffe Road to
Oxford Street.
View Larger Map
The work is part of the 2009 City of London Infrastructure Lifecycle Renewal Program.
|
Be the first to comment on this article.
|
Copyright 2006-2010 LondonTopic.ca News London Ontario
Advertise With Us
About Us
Contact Us
|